Six point Winch Monitoring System

January 6, 2017

A large offshore cable-laying company approached DLM to design a Winch Monitoring System to enable them to measure the line tension on the Winch cables used to steer their cable-laying vessel.

DLM Engineers designed a Winch Monitoring System comprising of four 60-tonne Running Line Monitors each with a local display for showing the load on the line. These fed back to a central HMI display in the control room which had a graphical view of the vessel along with winch lines and their associated line tension.

The central display had the capability of internally data logging as well as retransmitting the tension values in serial RS485 format, along with remote access via a web browser when connected by Ethernet.

Our case studies

Subsea Data Logger DL-3.0

DLM’s Subsea Data Logger: Load Monitoring in Subsea Environments

Posted on May 1, 2026

The Important Role of Load Monitoring in Subsea Applications In subsea and offshore operations, understanding how your equipment is performing is essential. Load monitoring helps…

Read more about DLM’s Subsea Data Logger: Load Monitoring in Subsea Environments
Stingray attached to train arrangement

Stingray Tracks Grapnel Train Positioning in North Sea Pre-Lay Grapnel Runs

Posted on October 7, 2025

Our client, Leask Marine, was conducting Pre-Lay Grapnel Runs ahead of installing two export cables for a North Sea wind farm and approached us to develop a solution that enabled accurate tracking of their grapnel train within a narrow corridor.

Read more about Stingray Tracks Grapnel Train Positioning in North Sea Pre-Lay Grapnel Runs
Grapnel Train

DLM’s Complete Grapnel Train Solutions

Posted on June 4, 2025

Selecting the most effective combination of grapnels for specific seabed conditions has long been a challenging and time-consuming process for companies involved in PLGR, cable laying, and cable recovery operations.

Read more about DLM’s Complete Grapnel Train Solutions
View all case studies